Concrete Demonstration Structures in Offenbach
Concrete without IronConcrete Demonstration Structures in Offenbach
Concrete without Iron
Concrete Demonstration Structures in Offenbach
Concrete without Iron
In terms of construction history, they are small gems, built in 1879 for the Hessian State Trade Exhibition: to this day, the exhibits of the cement works W. Feege & Gotthard speak of the almost boundless expectations placed at the time on the technical and commercial potential of the new way of building with (still unreinforced) concrete.The Building
The invention and rapid improvement of Portland cement in the course of the 19th century laid crucial foundations for building with concrete. The young construction industry countered initial reservations about the new material with numerous demonstration structures at trade and industrial exhibitions. Two particularly early examples were built in 1879 for the Hessian State Trade Exhibition in Offenbach. They survive at their original site to this day.
The structures were the work of the cement works W. Feege & Gotthard, founded only a few years earlier. Bearing a jaunty motto (“Als gut bereits zur Römerzeit erkannt / Und heutzutage noch so wenig angewandt” – “Recognized as good in Roman times already / And yet so little used today”), the buildings showcased not only the structural possibilities of concrete. Different kinds of surface treatment also demonstrated its potential for design. Architectural forms, however, are displayed only by a pavilion on a square plan with sides of approx. 3.5 m, roofed with a truncated dome. A half-height lateral annex, accessible via a concrete staircase, demonstrates two possible types of floor construction. Resting on iron edge beams are a slender segmental vault spanning about 4 m and – at right angles to it – a flat slab spanning 1.6 m. In addition, a “cement concrete vault” spans a park path between accentuated abutment blocks. With a clear span of 16 m, it is only 28 cm thick.
Construction
Even to today’s observers, the concrete structures, designed without any reinforcement, appear “springy and feverish” (Dieter Bartetzko). It was precisely for this reason that W. Feege & Gotthard had load tests carried out at the time on arches whose dimensions and span corresponded to the segmental vault shown here. The results appeared to confirm exaggerated expectations of the performance of concrete, as did a load test on the concrete vault after the exhibition closed. The following year, however, a bridge with a span of 22 m, built by W. Feege & Gotthard for the large Düsseldorf Trade Exhibition, collapsed after only a few months in service. The cause of the collapse was identified as inadequately founded footings, which had shifted under the thrust of the arch in ground softened by persistent rain.
Future
A similar fate could have befallen the Offenbach structures, which likewise optimistically pushed along the limits of what was feasible. Over time, numerous refurbishment campaigns were needed to secure all arched elements with tie rods, strengthen the foundations and repair or replace damaged components. Currently, there is once again a risk of collapse, and temporary support structures have been securing the concrete models for several years now. Discussions are ongoing as to how these unique witnesses to the beginnings of concrete construction in Germany can be secured for the future and made fully accessible to the public again.
Key Facts
Location: Dreieich-Park, Dreieichring, 63067 Offenbach am Main
Construction: 1879
Refurbishments: 1912, 1970, 1984, 2006
Structural design: presumably Bernhard Löhr
Construction and design: Portland-Cement-Fabrik W. Feege & Gotthard
Heritage status: Entered in the list of monuments in 1986 as part of the ensemble “Anlagenring Stadt Offenbach.”Further Reading
[Carl] B[ernhard] Löhr: “Ueber Belastungsproben von Gewölbbögen.” In: Deutsche Bauzeitung 13 (1879), no. 71, pp. 358–361.
Knut Stegmann: Das Bauunternehmen Dyckerhoff & Widmann. Zu den Anfängen des Betonbaus in Deutschland 1865–1918. Tübingen / Berlin 2014, p. 68.
Philipp Grillich / Michael Auras: “Die Betonmodelle in Offenbach.” In: Industriekultur 30 (2024), no. 1, pp. 6 f.
- 1888
-
Former Machine Hall in Dessau
From the World Exhibition to DessauMachine Hall in Dessau
From the World Exhibition to DessauFormer Machine Hall in Dessau
Structure as an Architectural Element
The Kraftmaschinenhalle (Machine Hall) at the 1910 World Exhibition represented modern German industrial culture and, with its clearly articulated steel structure, became an influential model. At its present site in Dessau, it continues to impress as an outstanding example of the art of industrial building.
The Building
At the 1910 World Exhibition in Brussels, Germany presented itself in a separate group of buildings, designed largely by members of the Werkbund and brought together by Emanuel von Seidl into an overall composition. Both the exhibits and the interiors were intended to convey a new, “German” approach to the applied arts and industrial building. Peter Behrens acted as artistic adviser for three halls, among them the Machine Hall, in which power-generating machines and related apparatus were displayed.
Construction
In cross-section, the building, around 56 m long and 40 m wide, followed the type of the three-aisled assembly hall. Its defining features were eight unusually curved steel trusses, which in the longitudinal direction defined seven bays, each with a center-to-center spacing of 7.93 m. Committed to the “principle of closed construction,” the load-bearing structure consisted largely of solid-web members, in contrast to the lattice construction common at the time, which was often criticized as chaotic. Only the columns between the side aisles and the central nave, almost 24 m wide, were executed as lattice members. The reason was the wish for a statically determinate system with fixed-base interior columns and cantilever arms reaching out on both sides. The drawback of relatively wide columns, whose novel K-bracing appeared almost ornamental, was more than offset, as far as the effect of the interior was concerned, by the fact that visible tension cables could now be dispensed with: undisturbed, the prismatically faceted three-hinged arches of the fully glazed roof light above the central nave had a particularly striking effect.
In the Machine Hall, Behrens for the first time consistently celebrated the structure as an architectural element; at the same time, the building earned the cooperating firm Breest & Co., which had erected it largely at its own expense, a lasting reputation as an innovative steel construction company. After the World Exhibition closed, the firm relocated the much-admired building to Dessau, where, next to an existing locksmith’s workshop, it henceforth served the machine factory G. Polysius as a loading hall.
Future
At its new site, the interior initially remained largely unchanged; by incorporating newly built solid end façades into the load-bearing structure, however, two additional bays were gained. A first significant intervention in the spatial effect came in the 1920s, when large parts of the generous lantern glazing were removed. In the course of continuous industrial use, further original elements were gradually lost, and the original color scheme, based on the contrast between white surfaces and the blue-grey steel structure, was abandoned. Particularly drastic was the welding of wide steel plates onto the delicately designed bracket supports of the crane runway, probably when the overhead traveling crane was replaced. Despite all these losses, the building remains captivating today – as a memorial to the once-propagated union of art and technology and as an authentic example of an outstanding achievement of industrial architecture that has been in continuous use for 115 years.
Key Facts
Location: Brauereistraße 13A, 06847 Dessau-Roßlau
Construction: 1909/10; re-erected in Dessau 1910/11
Structural design and construction: Breest & Co., Berlin (chief engineer Richard Kottke)
Design: Peter Behrens; façades in Brussels by Emanuel von Seidl, in Dessau by Max Beuthner
Heritage status: Entered in the list of monuments of the State of Saxony-Anhalt under object no. 094 40206.
Further ReadingRoland May: “Die Kraftmaschinenhalle der Weltausstellung 1910 in Brüssel von Peter Behrens – ein Markstein der modernen Industriebaukunst.” In: Denkmalpflege in Sachsen-Anhalt 32 (2024), no. 1, pp. 21–37.
Axel Schuhmann: “Von Brüssel nach Dessau. Die Kraftmaschinenhalle von Peter Behrens als Werkhalle der Firma G. Polysius in Dessau.” In: Denkmalpflege in Sachsen-Anhalt 32 (2024), no. 1, pp.
- 1924
-
Sternbrücke Hamburg
Erected High Up in the AirSternbrücke Hamburg
Erected High Up in the Air
Sternbrücke Hamburg
Erected High Up in the Air
Built in 1925/26, the Sternbrücke (Star Bridge) in Hamburg-Altona is a remarkable example of high-modern engineering. Its difficult urban setting posed very particular challenges during construction. The bridge is moreover an early example of the use of the higher-strength steel St 48 and vividly demonstrates the efforts of the Reichsbahn (German national railway) during the Weimar years to establish more economical methods of construction.The Building
The Sternbrücke replaced an earlier structure of 1893 spanning a junction of several important traffic routes known as the “Stern” (star). On its opening, the replacement was celebrated as a “brilliant achievement of German engineering,” not least because its construction had caused only very minor traffic disruption. To achieve this, the bridge superstructures had been assembled directly above and next to the old structure and lifted or slid into place during very short closures. Also noteworthy is the high-quality and elaborate design of the abutments, vaults and casemates, which drew on local traditions of brick architecture. Combined with the rigorous elegance of the steel superstructure, the result is an impressive dialogue between architecture and engineering.
Construction
The form of the steel members is strictly derived from the material and the structure. Two riveted plate girders of St 48, each only 2.80 m deep and up to 75 m long, form the core elements of each of the two double-track superstructures. They rest on a total of six steel columns in the street space as well as on two abutments and the adjoining casemates. The three-span girder solution with short end spans, typical of the period, made it necessary to secure the end bearings against uplift by means of counterweights.
Future
In February 2024, the Federal Railway Authority (Eisenbahn-Bundesamt) approved the replacement structure, a column-free tied-arch bridge 108 m long with a crown height of approx. 26 m. Shortly after the plans became known, the Initiative Sternbrücke had been founded. It campaigned for the preservation of the listed Sternbrücke and for intensive public participation in the planning. In July 2026, the old bridge was dismantled; since 31 August 2026, trains have been running over the new structure. (CJS)
Key Facts
- Location: Junction of Stresemannstraße / Max-Brauer-Allee, 22769 Hamburg-Altona
- Construction: 1925/26
- Structural design: Reichsbahndirektion Altona (Otto Blunck and Hans Kilian)
- Overall design: Reichsbahndirektion Altona
- Contractor: Louis Eilers, Fabrik für Eisen-, Hoch-, und Brückenbau, Hannover-Herrenhausen
- Heritage status: Entered in the Hamburg list of monuments in 2015 (cultural monument entry 43768)
Further Reading
- Otto Blunck: “Umbau der Sternbrücke in Altona.” In: Stahl und Eisen 47 (1927), no. 6, p. 235
- Sven Bardua: Brückenmetropole Hamburg. Baukunst – Technik – Geschichte bis 1945 (Schriftenreihe des Hamburgischen Architekturarchivs; 25). Hamburg 2009, pp. 20 f., 157
- Werner Lorenz: “Von der Notwendigkeit des Weiterbauens.” In: Eva Maria Froschauer et al. (eds.): Vom Wert des Weiterbauens (Kulturelle und technische Werte historischer Bauten; 4). Basel 2020, pp. 117–132
More Information
“Sternstunde null”: a film about the “Sternbrücke” in Hamburg-Altona (YouTube video, length: 44:11 minutes).
- 1934
-
Former Motorway Overpass “Weg Hesseler” in Beckum
A World Premiere in Prestressed ConcreteOverpass “Weg Hesseler” in Beckum
A World Premiere in Prestressed ConcreteFormer Motorway Overpass “Weg Hesseler” in Beckum

Stages in the production of the beams, summer 1938: a) tensioning of the steel bars in the bottom chord, with a finished beam in the background; b) cast-iron molds used as formwork for the bottom chord; c) casting a section of web and top chord – blankets prevent heat from escaping from the concrete in the cast-iron molds; d) the four finished prestressed concrete beams pushed into position.
The world’s first road bridge with bonded prestressing is internationally regarded as a milestone of high-modern civil engineering. Its relocation a few years ago raises complex questions about authenticity in the preservation of historic engineering structures.The Building
In autumn 1933, shortly after seizing power, the National Socialists launched the construction of the Reichsautobahn network. The ideal of grade-separated junctions made overpasses defining design elements of this large-scale infrastructure project. For economic reasons, the unorthodox type of the two-span reinforced concrete beam bridge became established for this purpose. After a few years, however, the wish to dispense with central piers and the mandate to save steel led to a search for alternatives. One proposal came from the construction company Wayss & Freytag. It had acquired a license from Eugène Freyssinet, the French “father of prestressed concrete,” and had demonstrated the safety of his new construction method in extensive test series. The result, in 1938, was the world’s first road bridge with bonded prestressing.
The structure, almost 50 m long, with a superstructure 6.4 m wide and spanning 33 m, carried the agricultural traffic of the farmer Schulze-Hesseler over the motorway near Oelde. A cast-in-place deck slab connected four prestressed I-beams to form a T-beam whose slenderness was sensational compared with conventional reinforced concrete bridges. With its cantilevered deck, light railing and stone-clad abutments, the overpass nevertheless remained committed to the design canon for such structures developed largely by the architect Paul Bonatz.
Construction
The beams were produced using the method Freyssinet had developed shortly before. On site, 52 high-strength manganese steel bars were first heavily pretensioned and hooked in pairs into a steel base plate. The bottom chord was then cast using modular cast-steel formwork. Heated by steam to 80 °C, the highly compacted concrete could be stripped after only two hours. Web and top chord were then cast in sections; they accommodated a further 24 prestressing bars as well as stirrups, which were likewise prestressed. Finally, the prestressing force was transferred to the concrete and the finished beam was pushed into its final position.
With its precast prestressed concrete elements, the “Weg Hesseler” overpass combined high load-bearing capacity with low steel consumption in a way that pointed to the future. Although prestressed concrete was initially used mainly in military installations, the experience gained here laid the foundation for its triumph in post-war bridge construction.
Future
The epoch-making structure was long considered structurally safe and was retained when the motorway was widened in the early 2000s. In 2010, however, load restrictions made a replacement structure necessary. Owing to its significance for the history of construction, the superstructure was moved to a nearby rest area in an elaborate and highly controversial operation. Despite extensive didactic and artistic presentation, the measure cannot conceal its character as a makeshift solution and vividly demonstrates how difficult it is to preserve historic bridges authentically once they can no longer fulfill their original purpose.
Key Facts
Location: Raststätte Vellern (A 2 motorway), Müllerstraße 31, 59269 Beckum
Construction: 1938; relocated 2012
Repairs: 1963, 1967, 1969, 1988, 1998, 2013
Structural design and construction: Neue Baugesellschaft Wayss & Freytag AG, Frankfurt am Main / Düsseldorf (Director Kurt Lenk, Rudolf Oppermann, Gotthard Franz); consultant: Eugène Freyssinet
Design: Oberste Bauleitung der Reichsautobahnen (Reichsautobahn Construction Directorate), Essen
Heritage status: Entered in the list of historic monuments of the town of Beckum since 1991 under object no. A 102.Further Reading
Neue Baugesellschaft Wayss & Freytag AG: “Erste Brücke aus Spannbeton über die Reichsautobahn.” In: Die Bauzeitung 36 (1939), no. 12, pp. 179–182.
Horst Metzler: “Eine frühe Spannbeton-Straßenbrücke nach dem Verfahren Freyssinet.” In: Wilhelm Buschmeyer (ed.): Betonbau in Forschung und Praxis. Festschrift zum 60. Geburtstag von György Iványi. Düsseldorf 1999, pp. 153–159.
- 1938
-
Sendehalle Europe 1
The Sky Shell of BerusSendehalle Europe 1
The Sky Shell of Berus
Sendehalle Europe 1
The Sky Shell of Berus
More than two and a half thousand square meters without a single column, and floating above them a curved shell spanning a good 80 m and yet only 5 cm thick: the transmitter hall of Radio Europe 1 stands almost paradigmatically for a way of building to which there seemed to be hardly any limits. Yet its dramatic construction history equally reveals, in exemplary fashion, the dark sides of high-modern engineering – the seductive power of the ideal of maximum lightness, the progress-blind misjudgment of potential risks and, not least, the disturbing hubris of believing oneself all too safe and free from error.Clip: Werner Lorenz, Bernard Espion: Die Sendehalle von Radio Europe 1 in Berus. Berlin 2021.
Film: The transmitter hall of Radio Europe 1 in Berus
The Building
The construction of the hall is linked to the two most important pioneers of French shell construction. For Bernard Laffaille, however, it became the site of his greatest defeat: in September 1954, the shell structure he had designed tore apart while still under construction. In spring 1955, Eugène Freyssinet succeeded in completing it with a modified concept. But his “rescue of the hall” also proved to be of little lasting value: in 1980, the delicate surface structure was once again on the verge of failure. Only at the third attempt, in 1982, was today’s more reliable structure created.
Construction
The heart-shaped plan is covered by an anticlastic surface whose inclined axis drops from 9.50 m at the front to approx. 4.50 m at the rear. It is suspended between two reinforced concrete edge arches, mirror-symmetrical about the axis; to secure them, six massive prestressed tie bars cross the space. In its third version, the shell itself is now merely “dead load”: today, load transfer is handled solely by the closely spaced under-tensioning added in 1982.
Future
At the end of 2015, Radio Europe 1 ceased operating the transmitter hall, and ownership passed to the municipality. Its future use and the related question of who will operate it remain uncertain; initial concepts have been put forward. (WL)
Key Facts
- Location: Ittersdorfer Straße, 66802 Überherrn, Berus district
- Construction: [a] 1954, [b] 1954/55, [c] 1980–82
- Structural design: [a] Bernard Laffaille with René Sarger, Bureau C.A.P.E.M., Paris, [b] Eugène Freyssinet and Yves Guyon, STUP, Paris, [c] Pierre Xercavins, Bureau Europe Etudes Gecti, Clichy, for Freyssinet International, Boulogne Bilancourt
- Overall design: Jean-François Guédy with André Nejavits-Méry, Paris
- Construction: [a] Saar Bauindustrie AG, Saarlouis; STUP, Paris; Dillinger Hüttenwerke AG, Dillingen, [b] Saar Bauindustrie AG, Saarlouis; STUP, Paris, [c] Freyssinet International, Boulogne Bilancou
- Heritage status: Entered in the list of monuments of the Saarland in 1999
Further Reading
Axel Böcker / Rupert Schreiber: “La Cathédrale des ondes – die Kathedrale der Wellen.” In: Die Denkmalpflege 74 (2016), no. 1, pp. 70–78
Deutscher Werkbund Saarland (ed.): Das Europe 1 Sendezentrum im Saarland, Berus-Überherrn (Resonanzen; 2). Merzig 2020
Werner Lorenz / Bernard Espion: Die Sendehalle von Radio Europe 1 in Berus (Historische Wahrzeichen der Ingenieurbaukunst in Deutschland; 28). Berlin 2021Web Links
Werkbund Saarland, “Resonanzen” series
Institut für aktuelle Kunst at the Hochschule der Bildenden Künste Saar
Saarland Ministry of Education and CultureMore Information
The building is a subject of the sub-project Aged High Modernism in Reinforced Concrete (B3).
- 1956
-
Model of the Alster Swimming Hall, Hamburg
Structural Analysis by ModelModel of the Alster Swimming Hall, Hamburg
Structural Analysis by Model
Model of the Alster Swimming Hall, Hamburg
Structural Analysis by Model
The measuring model for the Alster Swimming Hall, completed in 1973, which survives to this day, marks the end of an era in which ambitious structures that pushed the “limits” of what could be calculated were explored and validated through model tests as a complement to structural calculation. Only the rise of digital verification methods rendered such tests obsolete in the 1970s.The Building
In the early 1960s, at the client’s request, Horst Niessen and Rolf Störmer, winners of the first and second prizes in the preceding architectural competition, jointly developed the design for an indoor swimming pool on Sechslingspforte in Hamburg. Together with Walter Neuhäusser, they conceived a roof supported at only three points, composed of two adjoining hyperbolic paraboloid (hypar) shells with free-spanning edge beams more than 50 m long. The task of turning this structure, a mere 8 cm thick, into reality fell to Jörg Schlaich of the renowned engineering firm Leonhardt + Andrä.
Construction
At the time, a roof this demanding could be analyzed by calculation only to a limited extent, which is why additional model tests were carried out at TH Stuttgart under the direction of Robert K. Müller. A model in micro-concrete, as originally envisaged, would have been too large, so the choice ultimately fell on acrylic glass – even though its linear-elastic behavior differed considerably from that of the real material. This allowed the shell thickness to be reduced to 3 mm and the scale to 1 : 26.67, making it possible to build and test a complete model of the roof.
Each of the two partial shells consisted of four bonded strips of Plexiglas and was shaped, after heating, on a timber formwork that exploited the families of straight lines contained in the ruled surfaces characteristic of the hypar. Building the edge beams with their triangular cross-section, integrated into the thickened shell edges, called for complex craft solutions. The fabrication process and the subsequent model tests were documented in telling photographs, which were rediscovered in the SPP 2255 sub-project “Die letzten Zeugen” (The Last Witnesses). They illustrate the effort required to produce the model, which spans up to 4 m, and the associated measuring and testing equipment used to simulate loads from self-weight, snow and wind as well as support displacements caused by settlement.
Future
The measuring model for the Alster Swimming Hall, built in 1968–73, marks the end of an era, lasting several decades, in which daring building projects were safeguarded by elaborate model tests. Shortly afterwards, computer programs for finite element analysis took over this task. Stripped of its testing equipment, the fascinating model now stands in the foyer of the Faculty of Civil and Environmental Engineering at the University of Stuttgart. The poor condition of this object, one of the last witnesses to an important high-modern method of developing designs at the frontiers of knowledge, suggests that, in addition to conservation and restoration measures, protected storage will also be needed in the medium term.
Key Facts
Location: Ingenieurwissenschaftliches Zentrum II, Pfaffenwaldring 7, 70569 Stuttgart
Year built: 1965
Model construction and testing: Institute for Photoelasticity and Model Measurements (Institut für Spannungsoptik und Modellmessungen), TH Stuttgart, with Ingenieurbüro Leonhardt + Andrä, Stuttgart
Heritage status: The model is not a listed monument.Further Reading
Robert K. Müller / Rolf Kayser: “Das Hyparschalen-Dach des Hallenbades Hamburg Sechslingspforte. Teil II: Modelluntersuchung.” In: Beton- und Stahlbetonbau 65 (1970), no. 10, pp. 245–249.
Benjamin Schmid / Christiane Weber: “Das Messmodell für die Alster-Schwimmhalle Hamburg – ein interdisziplinäres Zusammenwirken Stuttgarter Bauingenieure auf dem Gebiet der Modellstatik.” In: Christoph Rauhut et al. (eds.): Materialgerecht konstruiert!?! Tagungsband der Fünften Jahrestagung vom 10. bis 11. Juni 2021 in Zürich [Schriftenreihe der Gesellschaft für Bautechnikgeschichte; 4]. Petersberg 2023, pp. 207–224.
- 1967
-
Sports Hall KT60L
A GDR Standard Building with Model CharacterSports Hall KT60L
A GDR Standard Building with Model Character
Sports Hall KT60L
Freie Waldorfschule Magdeburg e.V.
Within the DFG Priority Program SPP 2255 “Kulturerbe Konstruktion,” researchers from TU Bergakademie Freiberg and TU Braunschweig are studying the structures of VEB Metalleichtbaukombinat (MLK). One of the MLK’s standard building types is the KT60L sports hall.
The sports hall of the Freie Waldorfschule Magdeburg e.V. was built in the mid-1970s and refurbished in 2007 and 2010/11. Owing to its innovative approach to preservation, it serves as a model for the treatment of GDR standard buildings, both in general and in heritage conservation.Future
On Heritage Open Day, this potential monument will be opened and presented to the public. The next Heritage Open Day takes place on Sunday, 10 September 2023. Guided tours will also be offered at 11 a.m., 12 noon and 2 p.m.
The address of the building is Freie Waldorfschule Magdeburg e.V., Kroatenwuhne 3, 39116 Magdeburg. - 1975
- 1879
-
Hohe Esse in Halsbrücke
Once the Tallest Chimney in the WorldHohe Esse in Halsbrücke
Once the Tallest Chimney in the World
Hohe Esse in Halsbrücke
Once the Tallest Chimney in the World
Since 1890, the “Hohe Esse” (Tall Chimney) has carried flue gases from the smelting works in the Mulde valley into higher layers of the atmosphere. Once the tallest chimney in the world, the structure still shapes the former Saxon mining landscape around Freiberg today as an authentic testimony to industrial history.The Building
The Hohe Esse was built towards the end of the 19th century as a technical response to a serious environmental problem. Various ores were smelted in the Halsbrücke smelting works, situated deep in the valley of the Freiberger Mulde. The flue gases released large quantities of dust containing arsenic and sulfur, causing massive damage to vegetation around the village. An exceptionally tall chimney was therefore erected some 60 m above the valley floor in order to carry the emissions over the surrounding hills.
With an overall height of 140 m, the Hohe Esse held the title of the world’s tallest chimney for around two decades. It is fed by a flue gas duct some 500 m long, known as the “Fuchs.” Starting from the smelting works, the duct first crosses the river on a lead-clad timber structure and then runs uphill as a masonry construction. It opens into a 9 m high base with a square plan, above which rises the stack proper. Its circular diameter tapers continuously from 8.25 m to just 3.0 m at the top, while the thickness of the load-bearing wall decreases from 1.5 m to a remarkably slender 25 cm. Cornices below the top, like the intricately structured walls of the base, bear witness to the design aspirations of this utilitarian architecture, which defines the townscape and landscape.
Construction
In technical terms, the structure was modeled on the large chimney of the Magdalenenhütte in Mechernich (“Langer Emil”), built shortly before, although here the exposed location placed particular demands on the structural analysis of a construction loaded purely in compression. The structure, weighing a good 5,400 t, was founded on the underlying gneiss bedrock, which was leveled with a thin layer of concrete. Although only a handful of bricklayers could work at the same time on the stack, which was built of radial bricks, more than one million bricks were laid in just 177 working days. To prevent open joints, the courses were inclined at right angles to the outer surface, which has a batter of 1:50. Iron tension bands, painted with red lead and spaced increasingly closely towards the top, were intended to prevent cracking.
Future
As the tallest surviving brick chimney in Europe, the Hohe Esse today strikingly marks the transition from craft-based, empirical construction to construction grounded in scientific theory. Despite – or precisely because of – regular repairs, the overall system of chimney, flue duct and canal bridge, which is still in use, also represents an exceptionally authentic testimony to early environmental technology in the metallurgical industry. The technocratic approach of the time is almost paradigmatic of High Modernism: although nature in the immediate surroundings of Halsbrücke recovered astonishingly quickly once the installation went into operation in 1890, the pollutant load subsequently caused new environmental damage in more distant forest areas for many years.
Key Facts
Location: An der Hohen Esse, 09633 Halsbrücke
Construction: 1888/89
Repairs: 1975, 2008, 2023
Structural design: Building administration of the smelting works (Oscar Hüppner, master builder of the Halsbrücke smelting works)
Contractor: Specialgeschäft für Fabrikschornsteinbauten H. R. Heinicke, Chemnitz
Heritage status: Entered in the list of cultural monuments of the Saxon State Office for the Preservation of Monuments (Landesamt für Denkmalpflege Sachsen) under object no. 08985257; since 2019 also part of the core and buffer zone of the UNESCO World Heritage Site Erzgebirge/Krušnohoří Mining Region.Further Reading
Arne Andersen: Historische Technikfolgenabschätzung am Beispiel des Metallhüttenwesens und der Chemieindustrie, 1850–1933 [Zeitschrift für Unternehmensgeschichte, Beiheft 90]. Stuttgart 1996, pp. 207–221.
Jörg Mäller: “Die ‘Hohe Esse von Halsbrücke’. Ein faszinierendes Bauwerk mit langer Geschichte.” In: dgfs echo – Informationen über die Aktivitäten der Deutschen Gesellschaft Feuerfest- und Schornsteinbau e.V. 17 (2024), no. 1, pp. 16–18.
- 1909
-
Mast 17 in Königs Wusterhausen
A Unique Testimony to the Pioneering Days of RadioMast 17 in Königs Wusterhausen
A Unique Testimony to the Pioneering Days of Radio.
Mast 17 in Königs Wusterhausen
A Unique Testimony to the Pioneering Days of Radio

Panorama of the Funkerberg from the southeast, c. 1926. Postcard no. 1428, published by W. Meyerheim, 1932.

General view of Mast 17 from the southeast; in the foreground, parts of a former RIAS transmitter mast from Berlin-Britz, 2016 (www.funkerberg.de). Photo: Thomas Wiegold

Model of the Funkerberg in 1938/39. Mast 6 (later Mast 17) is in the center of the image, above the trapezoidal building complex of the former radio barracks. The blue triangle marks the tower. Wikimedia Commons, V. Boldychev, 2021.

View from the south of Mast 17 from the anchor point of the two outer guy cables, 2021. Sender- und Funktechnikmuseum Königs Wusterhausen (Museum of Transmitter and Radio Technology)
Together with five other masts and a free-standing tower at the center, “Mast 17,” erected at the end of 1924, carried the antennas of the new long-wave transmitter at Königs Wusterhausen. Today the “skyscraper,” almost 215 m tall, is a unique testimony – and not only to the pioneering years of radio broadcasting.
The Building
In late December 1920, the “Hauptfunkstelle” (main radio station) Königs Wusterhausen broadcast a Christmas concert, which is regarded as the nucleus of German radio broadcasting. Soon afterwards, the facility, with some 20 telegraphy and telephony transmitters whose antennas were strung between seven support masts up to 150 m tall, was already bursting at the seams.
Between 1922 and 1925, a generous extension was carried out in two construction phases, its most conspicuous element being a huge steel tower. It was surrounded, in an irregular hexagon, by six lattice masts, each around 215 m tall. Together they carried the huge antennas for the long-wave transmitters of the new transmitter buildings 2 and 3.
The so-called central tower rose 243 m into the sky (280 m had even been planned), making it the second-tallest free-standing structure of its time after the Eiffel Tower. Weighing 700 t, however, it was only one tenth as heavy as the French record holder. The daring structure was the work of Honnefwerke AG, which also erected the associated masts 1 and 4. Masts 2, 3 and 5 were based on concepts by the Swedish engineer Karl Ljungberg; mast 5 initially stood at the center of the facility until the central tower was completed. The three masts may have been erected by the renowned Berlin steel construction firm Hein, Lehmann & Co.; in any case, the firm ultimately contributed mast 6, to its own design, in the course of a second extension phase.
Construction
The company had been working on support masts for the antennas of the newly invented wireless telegraphy since as early as 1904. Among other things, Hein, Lehmann & Co., together with Telefunken, developed the world’s first large-scale radio station in Nauen, west of Berlin. There, several basic principles emerged for the antenna supports, which were rapidly growing ever taller: a slender steel lattice body with several guy cables, an articulated point bearing to compensate for oscillations, insulation from the ground by porcelain bodies, and antenna cables supported so as to be movable and kept under constant, even tension by concrete weights.
Whereas triangular cross-sections had still been used at Nauen, those at Königs Wusterhausen were all square. This also applied to mast 6, with its 2.30 m sides, even though for reasons of space it could only be guyed on three sides. In 1924 it was assembled within two months from around 90 t of steel angles and secured with 18 guy cables up to 280 m long.
Future
At the end of the 1930s, no fewer than 22 antenna supports rose into the sky on the “Funkerberg” in Königs Wusterhausen. Fifteen years later, their number had already been halved. Further dismantling followed, owing to reduced demand and concerns about structural stability after the central tower collapsed during a hurricane-force storm at the end of 1972. In the end, only the former mast 6 survived, as it was still needed until 1995 to carry an inclined-wire antenna for a long-wave transmitter. Since then, an active friends’ association has been looking after the preservation of the structure, renamed Mast 17 in the meantime, as well as the numerous other relics of broadcasting history on the Funkerberg. An extensive refurbishment of the oldest large antenna support in Germany is currently being prepared.
Key Facts
- Location: Königs Wusterhausen, Funkerberg
- Construction: 1924/25
- Refurbishments: 2007, 2009/10
- Structural design: Hein, Lehmann & Co. AG, Berlin-Reinickendorf (head: Franz Bräckerbohm)
- Heritage status: Entered in the list of monuments of the State of Brandenburg in 1994.
Further Reading
- W[alter] Meyer: Telefunken in Königswusterhausen. 3rd ed., Berlin 1928.
- Otto Lemke: “Königs Wusterhausen. Von der militärischen Zentralfunkstation zur postalischen Hauptfunkstelle.” In: Archiv für das Post- und Fernmeldewesen 20 (1968), no. 2, pp. 115–163.
- Gerd Klawitter (ed.): 100 Jahre Funktechnik in Deutschland: Funksendestellen rund um Berlin. 3rd ed., Dessau 2004, pp. 61–92.
- Christine Oliwkowski: “Die Hauptfunkstelle Königs Wusterhausen – ‘[…] wegen ihrer Vielgestaltigkeit die interessanteste Funkstation der Welt’.” In: Felix Engel / Kristina Hübener (eds.): Königs Wusterhausen. Eine Stadtgeschichte. Berlin 2020, pp. 267–297.
Web Links
Mast 17 on the website of the Funkerberg Museum in Königs Wusterhausen
- 1925
-
Aircraft Hangars 5 and 6 of the Former Cottbus Air Base
Light and DemountableAircraft Hangars 5 and 6 in Cottbus
Light and Demountable
Aircraft Hangars 5 and 6 of the Former Cottbus Air Base
Light and Demountable
The First World War revealed the need to be able to set up and dismantle an airfield with its associated infrastructure quickly, sometimes in places that were difficult to access. Prompted by this, Ottokar Paulssen developed demountable aircraft hangars from the mid-1920s onwards, first for the Junkers company and later for the Ostdeutsche Landwerkstätten. Their load-bearing structures were always composed of uniform individual components that could be transported over long distances without mechanical aid and bolted together on site by semi-skilled workers. This impulse, typical of High Modernism, to realize complex technical buildings on the basis of rational modular solutions is particularly evident in two identical aircraft hangars of the former Cottbus air base.The Buildings
The two hangars were built in 1934 as part of an expansion of the military section of Cottbus airfield. This had been established a year earlier for the “Deutsche Verkehrsflieger-Schule” (German Commercial Pilots’ School), a cover organization for the officially prohibited air force. Both halls have a basket-arch cross-section and cover a column-free floor area of 30 x 31.50 m. Hangar 5 is surrounded on three sides by single-story annexes; its twin was dismantled in 2004 and re-erected in 2010–12, without annexes, on the grounds of the Military Aviation Museum in Virginia Beach, USA.
Construction
The buildings are demountable “OLA halls,” based on a system for which a patent was filed in Germany in 1932. Their main load-bearing elements are arched steel trusses, each formed by two parallel sets of members. The joints and centers of the bolted members are offset from one another in each of the two sets. Near the ground, the member chains consist of sheet-metal laminations with a U-shaped cross-section; above that, they are resolved into lattice work made of angle sections. Together with purlins, likewise bolted together, they support a sheet-metal roof. Cross-bracing and a horizontal lattice girder above the door opening provide stiffening.
Future
Both halls were in continuous use until the airfield closed in 2003. Hangar 6, relocated to America soon afterwards, is now used to display German military aircraft from the Second World War. Its counterpart that remained in Cottbus has since accommodated a wide range of temporary commercial and cultural uses. In the long term, it is to be integrated into the Technologie- und Industriepark Cottbus, which is currently being developed. (RM)
Key Facts
- Location of Hangar 5: Levinestraße, 03044 Cottbus
- Location of Hangar 6: Princess Anne Rd, Virginia Beach, VA 23457, United States
- Construction: 1934
- Structural design and construction: Ola Ostdeutsche Landwerkstätten GmbH, Berlin (Ottokar Paulssen)
- Heritage status: Hangar 5 is part of the “Flugplatz Cottbus-Nord” ensemble, listed since 2000; the listing of Hangar 6 was lifted in 2003.
Further Reading
Ottokar Paulssen: “Grundlagen des Leichtbaues.” In: Stahl und Eisen 56 (1936), no. 4, pp. 81–86
Hans-Peter Arlt: Der Heeresflugplatz Cottbus und dessen Umnutzung. Master’s thesis, BTU Cottbus, 2002
Roland May: Die Hangars des ehemaligen Fliegerhorstes Cottbus – Geschichte und Bedeutung. In: Corinna Tell (ed.): Entwicklungsszenarien für das Hangar-Ensemble des ehemaligen Heeresflugplatzes Cottbus. Dokumentation des 16. Studierendenworkshops des Deutschen Nationalkomitees für Denkmalschutz in Cottbus vom 4. bis 11. September 2022 [Schriftenreihe des Deutschen Nationalkomitees für Denkmalschutz; 106]. Berlin: Deutsches Nationalkomitee für Denkmalschutz, 2023, pp. 24–32. ( → free order or PDF download)Web Links
Film footage of the re-erection of Hangar 6 in Virginia Beach (https://www.youtube.com/watch?v=tgnTq08B6YI)
- 1938
-
Motorway Maintenance Depot Munich-West
Aesthetic StopgapsMotorway Maintenance Depot Munich-West
Aesthetic Stopgaps
Motorway Maintenance Depot Munich-West
Aesthetic Stopgaps
With the Reichsautobahnen, the systematic construction of a network of high-speed roads in Germany began under the Nazi dictatorship. The infrastructure program, directed by Fritz Todt as “General Inspector of German Roads,” comprised not only the routes themselves but also filling stations, service areas and road maintenance depots. Guidelines for their basic layout were provided by the architect Paul Bonatz. When these were executed by local construction firms, material-saving structural systems were used here too, as in numerous other state building projects of those years.The Building
The Munich-West motorway maintenance depot was sited at the starting point of the motorway to Stuttgart (today the A 8). The core of the complex consists of three plain buildings with tall roofs, arranged at right angles around a central courtyard. In two of the buildings, timber “Kroher ribs” were used. In the administration building, they served solely as trusses for the couple roof spanning 13.5 m. In the 14.5 m wide vehicle and equipment hall, the ribs were also used for the first time in the ceiling structure. Their span is halved by a flush longitudinal downstand beam suspended from the ridge by steel tension rods. For better fire protection and to make better use of the roof space for storage, such timber ceilings were replaced by reinforced concrete structures in later motorway maintenance depots.
Construction
Between 1935 and 1945, around a dozen new types of nailed roof structure were developed in Germany. The way had been paved by DIN 1052 “Timber Construction,” introduced in 1933, which for the first time contained specifications for load-bearing nailed connections. Such “economy methods” quickly gained outstanding importance in the engineered timber construction of the period, since nails were not patented as fasteners, were readily available and easy to use even for laypeople. Ludwig Kroher, a master builder from a Munich carpentry family, moreover promised timber savings of 40 to 70 percent compared with conventional roof structures with his system, patented in 1938 (DRP 723,700). V-shaped lattice girders with tapered top and bottom chords were erected in pairs as rafter triangles above a ceiling that absorbed the tensile forces. Placed side by side, the Kroher ribs formed a folded roof structure that required no additional longitudinal bracing and allowed for a column-free roof space.
Future
Kroher’s economy construction, little known today, bears witness to how intensively the construction industry, too, was drawn into preparations for war during the Nazi era through strict rationing of materials. Nailed by hand at great expense of time, the construction method fascinates with its open, light structure, its carefully considered details and the distinctly aesthetic effect of the regular folded structure. Even though board thicknesses and nail edge distances no longer comply with current standards, the more than 85-year-old roof and ceiling structures of the Munich motorway maintenance depot remain in very good condition. They were preserved almost unchanged even when the attic above the administration building was converted. The flexibility and performance of the Kroher system are further demonstrated by extensive conversion works on another building in Dresden-Hellerau, where only additional collar beams had to be inserted to counteract excessive deflection.
Key Facts
Location: Bergsonstraße 30, 81245 München-Obermenzing
Construction: 1938–1940
Structural design: Ludwig Kroher, Munich
Check engineer: Max Mayer, Munich
Overall design: Heinrich Rettig, Munich
Timber construction: Baugeschäft Josef und Ludwig Kroher, Munich
Heritage status: Not a listed monument.Further Reading
“Die Rippen der Ludwig-Kroher-Dachkonstruktion als Dachstuhl und Deckenträger.” In: Der Deutsche Zimmermeister 41 (1939), no. 33, pp. 416–419.
Iris Engelmann / Jens Schwendner / Werner Seim: “Materialsparende Nagelbinder – Aspekte der Konstruktionsgeschichte von 1930 bis 1990.” In: Bautechnik 100 (2023), no. 11, pp. 53–63.
More Information
- 1954
-
Haus der Kulturen der Welt in Berlin
Rebuilt to Match the PostcardHaus der Kulturen der Welt in Berlin
Rebuilt to Match the Postcard
Haus der Kulturen der Welt in Berlin
Built in 1957 and partially collapsed in 1980, today’s Haus der Kulturen der Welt (House of World Cultures) was rebuilt by 1987 to look “just like the postcard.” Yet not only is the material fabric new; the structure, too, is entirely different. It does, however, come very close to the original concept, which was never realized. What, then, is authentic here, and in what way?
The Building
The opening of the (West) Berlin Kongresshalle (Congress Hall) in September 1957 had been preceded by a controversial planning history. According to the design by the architect Hugh A. Stubbins, the building was to be roofed by a saddle-shaped cable net with concrete slabs laid on top, suspended free-spanning between two edge arches. Stubbins took his cue from the State Fair Arena in Raleigh, North Carolina, where a hyperbolic paraboloid of this kind had been realized as a roof structure for the first time in 1951/52. Whereas there, however, the edge arches were continuously supported by the façade of the hall, in Berlin they were to sweep far beyond the walls of the auditorium and be supported only at their springings: only a rigid fixity at these points would have secured the entire roof structure against overturning. In Fred N. Severud, Stubbins did have an outstanding structural engineer, who had already made the Raleigh arena a success – but with this considerably more daring design, Severud, too, met with outright rejection from his German colleagues: it was considered unbuildable.
Construction
In order to realize the grand gesture nonetheless, a trick was used and the roof was structurally divided into two zones. The hypar shell now covered only the auditorium and was supported by an additional ring beam. The remaining area up to the arches was covered by slab strips acting as beams. There was great enthusiasm for the newly developed technique of prestressing, which was applied to all structural members, right down to the tie in the subsoil that was meant to prevent the abutments from spreading. The structure, fragmented in this way, was controversial from the outset – evidently with good reason: on 21 May 1980, the southern arch suddenly tore away from the rest of the roof and collapsed; one person was killed. The cause was identified as corrosion-induced fractures of the tendons at the junction between the slab strips and the ring beam, which had been prepared by years of restraint stresses.
Future
The reconstruction sparked another controversial debate. The solution finally adopted was remarkably ambivalent: the restoration of the external form was matched by a fundamentally altered structure. The load-bearing system now consisted of two separate hypar shells, one above the other – the enclosure of the auditorium and an outer shell that now genuinely hung free from arch to arch. Reopened in May 1987, the building has since become an established fixture of Berlin’s cultural life as the “Haus der Kulturen der Welt.” Its history tells a textbook story not only of the failure of designing against the flow of forces (and of the inherent hubris of high-modern structural thinking), but also of the power of the pure form of a suspended roof. As a result, the monument today conveys Stubbins’s original structural concept more authentically than before – but at the same time also an understanding of authenticity that, in the “postcard-identical” reconstruction, was limited solely to external appearance.
Key Facts
(a): Original building; (b): Reconstruction after partial collapse
Location: John-Foster-Dulles-Allee 10, 10557 Berlin-Tiergarten
Construction: [a] 1956/57; [b] 1984–87
Structural design: [a] Preliminary design: Severud-Elstad-Krueger Associates; detailed design: Arge Kongreßhalle (joint venture of Philipp Holzmann, Wayss & Freytag, Grün & Bilfinger); [b] Dyckerhoff & Widmann (Helmut Bomhard [Leitung], Udo Kramer, Jürgen Mainz)
Overall design: [a] Hugh A. Stubbins; local architects Werner Düttmann, Franz Mocken [b] Hugh A. Stubbins; local architects Hans-Peter Störl, Wolf Rüdiger Borchardt
Contractor: [a] Arge Kongreßhalle (Philipp Holzmann, Wayss & Freytag, Grün & Bilfinger); [b] Dyckerhoff & Widmann
Heritage status: Entered in the Berlin list of monuments in 1958.Further Reading
Sigurd Fleckner: “Das Tragwerk des Daches der Kongreßhalle Berlin.” In: Beton- und Stahlbetonbau 52 (1957), pp. 233–236.
Jörg Schlaich / Karl Kordina / Hans-Jürgen Engell: “Teileinsturz der Kongresshalle Berlin – Schadensursachen. Zusammenfassendes Gutachten.” In: Beton- und Stahlbetonbau 75 (1980), no. 12, pp. 281–294.
Helmut Bomhard / Udo Kraemer / Jürgen Mainz: “Wiederaufbau der Kongreßhalle. Konstruktion und Bau.” In: Bauingenieur 61 (1986), no. 12, pp. 569–576.
Senator für Bau- und Wohnungswesen (ed.): Die Kongreßhalle. Geschichte, Einsturz, Wiederaufbau [Berlin baut; 2]. Berlin 1987.
- 1965
-
Haus Mayer-Kuckuk in Bad Honnef
A One-Off System BuildingHaus Mayer-Kuckuk in Bad Honnef
A One-Off System Building
Haus Mayer-Kuckuk in Bad Honnef
A One-Off System Building
A limited budget and the client’s openness to unconventional solutions resulted in an unusual residential building with a primary structure of glued laminated timber. Significant damage to the weathered beams made the preservation of this system building – which remained the only one of its kind – a challenge.The Building
In the 1960s, the architect Wolfgang Döring explored structuralist concepts for system buildings. For a single-family house in Bad Honnef, designed from 1965 onwards, economic considerations came to the fore alongside structural ones. The choice therefore fell on industrially manufactured components that could be assembled within a short construction period and allowed for modular extension.
Construction
The load-bearing structure of the building consists of pairs of columns resting on steel pins in concrete foundations, each pair clasped on three levels, like a pair of tongs, by two cantilevering beams; nailed-on trapezoidal panels fix the joints. This arrangement is repeated eight times and braced in the longitudinal direction by steel tension rods. The actual envelope of the two-storey building is set back behind the plane of the vertical structural members.
In order to stay within the tight budget, Döring used glued laminated spruce beams for the structural frame, simple blockboard for the bracing trapezoids and prefabricated sandwich elements for floors and walls. Painted black, the structural frame stands out emblematically against the white building envelope. The series production of the system that Döring had envisaged never materialized, so the building remained unique. It was listed as a historic monument in 2007.
Future
The economical construction proved challenging during the refurbishment that began in 2012. The glued laminated timber beams had turned out to be unsuitable for unprotected exposure to the weather. In addition, structural timber protection that had been improperly installed in the 1990s had aggravated the moisture problem. The damage extended far into the interior of the building, making the replacement of the structural members unavoidable.
Several proposals using different materials, including solid timber and steel, were developed and weighed against one another. The central question was which solution would preserve Wolfgang Döring’s ideas as authentically as possible while minimizing the loss of information embodied in the original fabric. In the end, glued laminated timber beams were chosen once again and used to replace the original structure piece by piece. They received a protective coating in the original color scheme as well as extensive sheet-metal cladding as structural timber protection on exposed and horizontal members such as the beam ends and trapezoidal panels.
The resulting authenticity of the building can be described as conceptual rather than material. By once again using glued laminated timber – an industrially produced material that is less expensive than the alternatives – Döring’s structural idea was preserved, even though the structural frame itself has not survived in its original substance. The price of this authenticity is the elaborate structural timber protection, which somewhat impairs the slender, simple aesthetic of the externally exposed structure.
Key Facts
Location: Bad Honnef, Böckingstraße 9
Construction: 1967
Refurbishments: 1993–95, 2012–16
Overall design: Wolfgang Döring
Contractor: Nachbarschulte, Dorsten
Refurbishment design 2012–16: Christian Welter, projektplus gmbh, Siegen
Structural engineering, refurbishment 2012–16: Manfred Otterbach, Niederfischbach
Refurbishment works 2012–16: Zimmerei Kray, Kirchen
Heritage status: Entered in the list of historic monuments of the town of Bad Honnef since 2007.Further Reading
Wolfgang Döring: Perspektiven einer Architektur. Frankfurt am Main 1970.
Heinrich Klotz: “Interview mit Wolfgang Döring.” In: idem: Architektur in der Bundesrepublik. Frankfurt am Main 1977, pp. 65–104.
Gundula Lang: “Instandsetzung von Haus Mayer-Kuckuk in Bad Honnef.” In: Niedersächsisches Landesamt für Denkmalpflege (ed.): Denkmalpflege als kulturelle Praxis. Zwischen Wirklichkeit und Anspruch. Hameln 2018, pp. 144–155.
Hartmut Witte: Haus Mayer-Kuckuk. Dokumente zur Restaurierung 2012 bis 2016, online: http://www.mayer-kuckuk.de/HausBuch.pdf (accessed 1 December 2025).
- 1970
-
ICC Berlin
House within a House, on a Grand ScaleICC Berlin
House within a House, on a Grand Scale
ICC Berlin
House within a House, on a Grand Scale
Built at the end of the 1970s, the Internationales Congress Centrum (ICC) Berlin can be read as the epitome of late architectural modernism in all its contradictions. Admired at the time for its enormous dimensions, its sophisticated structure, its technical equipment and, not least, its spectacular construction process, the building has today become a refurbishment case that can hardly be financed, owing to the ubiquitous use of asbestos-containing cladding, since recognized as disastrous. Notwithstanding this, the successful synthesis of architecture and engineering made the ICC a unique urban sculpture in what was then West Berlin, and it is still regarded as one of the city’s central landmarks.
The Building
Located on the northeastern edge of the exhibition grounds and connected to them by a three-story bridge structure, the ICC, measuring 320 m in length, 80 m in width and 40 m in height, was at the time one of the largest congress buildings in the world. Its position at the intersection of the urban motorway and the AVUS led to the key planning requirement of acoustically decoupling the entire interior from both the subsoil and the outer envelope. The answer was a house-within-a-house concept
Construction
The “inner house” is a complex reinforced concrete structure with prestressed transverse cross walls almost 60 m long as its main girders. 14 m high and 2.20 m wide, they collect all loads and transfer them at the quarter points into the substructure; elastomeric bearings ensure acoustic and vibration isolation. The “outer house” of the roof and external walls is executed as a steel structure. Twelve transverse frames, each spanning 60 m, terminate on two massive longitudinal lattice girders, which are supported by the eight stair cores placed in front of the building.
The construction process was no less spectacular than the structure itself. A specially designed traveling formwork was used for the gigantic cross walls, and while the shell of the interior was still being built, the pre-assembled roof trusses were already being slid into their final position on a temporary skid track.
Future
With construction costs of almost one billion Deutschmarks, the ICC was at the time the most expensive building ever erected in Germany, and over the following decades it developed into one of the most sought-after congress venues worldwide. Owing to its high operating costs and the refurbishment costs it faced, it was closed in 2014. It has been a listed monument since 2019; its future is uncertain.
Key Facts
- Location: Messedamm 11, 14055 Berlin-Westend
- Construction: 1975–1979
- Structural design: Manfred F. Manleitner, Horst Spandow, Hans Joachim StegemannIngenieurbüro Gerhard Bartels
- Overall design: Ralf Schüler, Ursulina Schüler-Witte
- Heritage status: Hangar 5 is part of the “Flugplatz Cottbus-Nord” ensemble, listed since 2000; the listing of Hangar 6 was lifted in 2003.
- Construction: General contractor: Neue Heimat Städtebau; solid construction: Strabag (lead) et al.; steel construction: Krupp Industrie- und Stahlbau (lead) and Peiner Stahlbau
- Heritage status: Entered in the list of monuments of the State of Berlin in 2019
Further Reading
- AIV Berlin (ed.): Berlin und seine Bauten, Teil IX: Industriebauten, Bürohäuser. Berlin 1971, pp. 53 f.;
- Gerhard Bartels: “ICC Berlin, Konstruktion und Technik.” In: Neue Heimat, Monatshefte für neuzeitlichen Wohnungsbau (1979), no. 3, pp. 68 f.;
- Ursulina Schüler-Witte: Ralf Schüler und Ursulina Schüler-Witte. Eine werkorientierte Biographie der Architekten des ICC. Berlin 2015, pp. 56–127
- Werner Lorenz / Roland May / Hubert Staroste: Ingenieurbauführer Berlin. Petersberg 2020, pp. 136 f.